Open the picking list related to a material allocation run
- Last UpdatedMay 07, 2026
- 1 minute read
Open the picking list related to a material allocation run in the s60031 Picking Lists screen. You can view all the picking lists that hold items created for any site Material Take-Off (MTO) item included in the material allocation run.
-
Navigate to the s23003 Material Allocation Run screen.
-
In the Current Project control block, from the Project dropdown, select the ID if the required project.
-
To refresh the screen, select the F5 key.
-
In the Material Allocation Run grid, select a row.
-
On the s23003 menu, in the Reservations group, from the Reservation Details dropdown, select Goto Picking List.
The s60031 Picking Lists screen appears. In the Picking List grid, view the picking list related to the site MTO included in the material allocation run. In the Line Items grid, in the Items tab, view the related picking list items.