Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

View a TMR from s22060

  • Last UpdatedMay 07, 2026
  • 1 minute read

Open the Technical Material Requisition (TMR) related to a Material Requisition (MR) in the s50016 Technical Material Requisition screen.

  1. Navigate to the s22060 Engineering Material Control screen.

  2. In the Current Project control block, perform the following:

    1. From the Project dropdown, select the ID of the required project.

    2. From the Requisition dropdown, select the ID of the required MR.

  3. To refresh the screen, select the F5 key.

  4. On the s22060 menu, in the Actions group, select Requisition Details.

    The s50016 Technical Material Requisition screen appears. View the details of the TMR related to the selected MR.

TitleResults for “How to create a CRG?”Also Available in