View a TMR from s22060
- Last UpdatedMay 07, 2026
- 1 minute read
Open the Technical Material Requisition (TMR) related to a Material Requisition (MR) in the s50016 Technical Material Requisition screen.
-
Navigate to the s22060 Engineering Material Control screen.
-
In the Current Project control block, perform the following:
-
From the Project dropdown, select the ID of the required project.
-
From the Requisition dropdown, select the ID of the required MR.
-
-
To refresh the screen, select the F5 key.
-
On the s22060 menu, in the Actions group, select Requisition Details.
The s50016 Technical Material Requisition screen appears. View the details of the TMR related to the selected MR.