Create context specific work items
- Last UpdatedMay 07, 2026
- 1 minute read
Create context specific work items from the s20010 Project Components, the s20012 Drawing Catalogue, the s21000 Part Lists, the s60028 Stock Item Delivery Registration, the s60007 Maintain Material Non-Conformance, the s70001 Construction Gantt View, the s70003 Construction Control, the s30000 Hull Unit Material List, and the s30001 Hull Units screens.
-
Navigate to the required screen.
-
On the Work Item menu, in the Work Item group, select Create work item.
The d0043 Create Work Item dialog appears.
-
In the Work Item grid, in the General tab, perform the following:
-
From the Department dropdown, select the required department.
-
In the Deadline field, select the required deadline.
-
From the Status dropdown, select the required dropdown.
-
From the Priority dropdown, select the required priority number.
-
-
In the Work Item grid, in the Description tab, perform the following:
-
From the Cause dropdown, select the required cause.
-
From the Process dropdown, select the required process.
-
From the Discipline dropdown, select the required discipline.
-
From the Defect dropdown, select the required defect.
-
From the Disposition dropdown, select the required disposition.
-
From the Site Id dropdown, select the required site ID.
-
-
(Optional) To send the work item to the responsible user, select the Send Work Item Message to Responsible checkbox.
-
Select Ok.
The work item is created.