Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise Resource Management

Create a piping MTO line

  • Last UpdatedMay 07, 2026
  • 1 minute read

A piping Material Take-Off (MTO) line consists of two levels of project breakdown structures: construction area and pipeline. A piping MTO line contains the identification details of the piping MTO required for a pipeline within a construction area. The details include the related drawing discipline, construction area, pipeline number, version, drawing, and so on. Each MTO line is related to a list of MTO items required for construction activities.

  1. Navigate to the s22040 Piping MTO screen.

  2. In the Current Project control block, from the Project dropdown, select the ID of the required project.

  3. To refresh the screen, select the F5 key.

  4. On the Home menu, in the Record group, select Create.

    In the MTO Lines grid, a row is created.

  5. Select the General tab and perform the following:

    1. From the Discipline dropdown, select the ID of a drawing discipline for a piping MTO line.

    2. From the Construction Area dropdown, select the ID of a construction area for the piping MTO line.

    3. From the Pipeline Number dropdown, select the ID of a pipeline for the piping MTO line.

    4. From the MTO Type dropdown, select the ID of the required MTO type.

  6. (Optional) Enter the relevant details in other fields as required. For more information on all the fields, see s22040 Field descriptions.

  7. On the Home menu, in the Record group, select Save.

    The piping MTO line is created.

TitleResults for “How to create a CRG?”Also Available in