Renumber TMR positions
- Last UpdatedMay 07, 2026
- 1 minute read
Renumber the Technical Material Requisition (TMR) positions according to the default increments defined in the s10023 Position Number Increments screen. However, if you define project specific increment values based on your requirements, then the defined increment value takes precedence over the default increment list.
For a TMR, in the Technical Material Requisition Header grid, in the General tab, if the value in the External status field is ISSUED, then you cannot renumber the PO positions.
-
Navigate to the s50016 Technical Material Requisition screen.
-
To refresh the screen, select the F5 key.
-
In the Technical Material Requisition Header grid, select a row.
-
On the s50016 menu, in the Requisition Options group, select Renumber Positions.
The TMR positions are renumbered sequentially.
-
To save the changes, on the Home menu, in the Record group, select Save.