s22060 Field descriptions
- Last UpdatedMay 07, 2026
- 5 minute read
Common fields in the screen
|
Field |
Description |
|---|---|
|
SI |
Status Indicator: Indicates the status of a record related to validation errors, warnings, and updates. |
|
Defined By |
The ID of a user who created a record. |
|
Defined At |
The date and time when a record was created. |
|
Updated By |
The ID of a user who updated a record. |
|
Updated At |
The date and time when a record was updated. |
|
Updated Application |
The application used to update a record. |
|
Defined Application |
The application used to create a record. |
Current Project control block
|
Field |
Description |
|---|---|
|
Project |
The ID of a project related to a material requisition (MR). |
|
Description |
The description of a project related to an MR. |
|
Status |
Indicates the status of a project. If the project is closed, then you cannot update any information for the MR. |
|
Template |
Indicates a project is a template project. A template project is a standard project that can help set up projects with the same method and structure as the template project. If the Template checkbox is selected, the project is not included in material status calculations or budget calculations. |
|
Requisition |
The ID of an MR. |
Material Control grid
The following table describes the fields in the General tab.
|
Field |
Description |
|---|---|
|
Status |
Indicates the balance quantity status and the manual adjustment status of a material. |
|
MR Number |
Material Requisition Number: The MR number related to a material. |
|
Title |
The title of an MR. |
|
Material Category |
The ID of a material category related to a material. |
|
Material ID |
The ID of a material or a part number of a material. |
|
Description |
The description of a material. |
|
Unit |
The unit of measure of a material. |
|
Site ID |
The ID of a site as specified in the part list or the Material Take-Off (MTO) related to a material. |
|
Required on Site At |
The date when the requisitioned items are required on site. |
|
Activity |
The ID of an activity related to a material. |
|
System |
The ID of a system related to a material. |
|
Approved Quantity |
The total approved quantity of a material derived from an approved MTO or an issued part list. |
|
Adjustment |
The quantity added or removed from the value in the Total Take Off Quantity field of a material. |
|
Adjustment Percentage |
The percentage of the value in the Current TMR Quantity field to set as the value in the Total Take-off Quantity field. |
|
Total Take-off Quantity |
The recalculated quantity of a material after considering the manual adjustments made to the value in the Approved Quantity field. |
|
On Hold Qty |
The quantity of a material that is on hold in an approved MTO or an issued part list related to the material. |
|
Surplus |
The excess quantity of a material calculated based on the value in the Total Take-off Quantity field and the surplus rules defined for a project in the s40002 Working Surplus Contingency screen. Working surplus is the extra quantity ordered for a requisitioned material when your estimation of the requisitioned quantity of the material is inaccurate. |
|
Contingency |
The excess quantity of a material calculated based on the value in the Total Take-off Quantity field and the contingency rules defined for a project in the s40002 Working Surplus Contingency screen. Contingency is the extra quantity ordered for a requisitioned material when some pieces of the material can be damaged at the time of delivery. |
|
RoundingQuantity |
The rounded-off quantity of a material added or removed from the value in the Total Take Off Quantity field based on the rules defined for a project in the s40002 Working Surplus Contingency screen. |
|
Total MTO Quantity |
The total required quantity of a material within a project and a site. For a project component, the total MTO quantity is determined after an MR is assigned to the project component in the s20010 Project Components screen. |
|
Other TMR Quantity |
The total quantity of a material requested in the other Technical Material Requisitions (TMRs) related to the material. |
|
TMR |
The ID of an existing TMR which lists the material as a TMR position for the site related to the current material. |
|
Current TMR Quantity |
The quantity of a material in a TMR related to an MR. |
|
Balance |
The quantity of a material remaining for a site in comparison to the material requirements. The value in the Balance field is the difference between the value in the Total MTO Quantity field and the combined value of the values in the Other TMR Quantity and the Current TMR Quantity fields. |
|
Total Balance |
The quantity of a material remaining across all MRs within a site. |
|
Project MTO Quan |
Project MTO Quantity: The MTO quantity of a material at a project level or an MR level. At a project level, the Project MTO Quan field displays the total MTO requirement quantity of a material for a project. At an MR Level, the Project MTO Quan field displays the total quantity of a material required in all the related MRs. |
|
New Qty to TMR (Before over order) |
The quantity of a material transfered to a TMR after considering the total MTO requirement of the material in a site. |
|
Seq |
The sequence in which the system reduces the material quantities when the TMR quantity exceeds the requisition scope of a project. The requisition scope is the total permissible quantity of a material you can order for a project. The logic for the order of the Engineering Material Control (EMC) lines to be considered for reduction is as follows:
|
|
MTO+WS&C+OverOrder Adj |
The new TMR quantity calculated after considering the values in the Total MTO Quantity, the Surplus, the Contingency, and the Adjustment fields. |
|
Qty Correction |
The rounded-off quantity reduced from the EMC lines to avoid inaccurate requisitions. |
|
Seq of rounding qty deduction |
The sequence in which the system reduces the material quantities by splitting the value in the Rounding Quantity field across TMR positions when the TMR quantity exceeds the requisition scope of a project. The logic for the order of the EMC lines to be considered for reduction is as follows:
|
|
New Quantity To TMR |
The quantity of a material transferred to a TMR after considering the value in the Balance field. |