Copy a VDRS from a TMR
- Last UpdatedMay 07, 2026
- 1 minute read
Copy a Vendor Deliverable Requirements Schedule (VDRS) from one Technical Material Requisition (TMR) to another TMR.
Prerequisites
-
For the source TMR, in the Technical Material Requisition Header grid, in the General tab, perform the following:
-
In the Internal status field, ensure the value is Create/Change.
-
Ensure the VDRS checkbox is selected.
-
-
Ensure both the source TMR and the target TMR belong to the same project.
To copy a VDRS from a TMR
-
Navigate to the s50016 Technical Material Requisition screen.
-
To refresh the screen, select the F5 key.
-
In the Technical Material Requisition Header grid, select a TMR (target TMR) to which you want to copy the VDRS.
-
On the s50016 menu, in the Add VDRS/ITR group, select Copy VDRS from TMR.
The d0140 Copy VDRS from TMR dialog appears.
-
In the Technical Material Requisitions grid, select a TMR (source TMR) from which you want to copy the VDRS.
-
Select Insert.
The VDRS is copied and added to the TMR selected in the Technical Material Requisition Header grid. In the VDRS tab, in the Vendor Deliverable Requirements Schedule grid, view the VDRS details.
-
(Optional) Modify the VDRS according to your requirements.
-
To save the changes, on the Home menu, in the Record group, select Save.