Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise SCADA

Create a pending record

  • Last UpdatedApr 24, 2025
  • 1 minute read

Perform this procedure if you are not yet ready to save the results of a Point to Point Verification to the CRM database.

Before you begin

Complete the steps in Enter the results of Point to Point Verification.

To create a pending record

  • On the Point Verification Control dialog box, select Unverify.

    The record is now in a pending state, and the dialog box appears pre-loaded with configurable verification information.

What to do next

To modify the record, refer to Modify a pending record.

In This Topic