Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise SCADA

Override an element's current, cumulative flow rate

Override an element's current, cumulative flow rate

  • Last UpdatedApr 24, 2025
  • 1 minute read

To override an element's current, cumulative flow rate

  1. On the Flow Total Control dialog box, select Manual.

  2. Navigate to the Total [0-3] section corresponding to the flowTotalConfig record element whose flow rate you want to override.

    For example, to override element 1, you would override the value in the Total 1 section.

  3. In the Override field, overwrite the existing value with the new, desired value.

  4. Select Submit.

  5. Select Dismiss.