Modify a point's command order
- Last UpdatedApr 24, 2025
- 1 minute read
Follow this procedure to change the order in which the system issues a command against a point belonging to a MultiControlGroup record.
To modify a point's command order
-
Navigate to the desired Pending Control dialog box (refer to Open a Pending Control dialog box).
Pending Analog Control dialog box

-
In the Command Order field, enter the desired command order number (default = "0").
-
Select Submit.