Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

AVEVA Enterprise SCADA

Modify a point's command order

  • Last UpdatedApr 24, 2025
  • 1 minute read

Follow this procedure to change the order in which the system issues a command against a point belonging to a MultiControlGroup record.

To modify a point's command order

  1. Navigate to the desired Pending Control dialog box (refer to Open a Pending Control dialog box).

    Pending Analog Control dialog box

  2. In the Command Order field, enter the desired command order number (default = "0").

  3. Select Submit.

Related Links