Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Scenario 2 - Design Based on Existing Initial Project Data

Scenario 2 - Design Based on Existing Initial Project Data

  • Last UpdatedJan 18, 2023
  • 1 minute read

In this scenario a cruise liner configuration is assumed, where the hull surface and compartmentation is set.

The main steel structures (decks, bulkheads, ) are created using the RSOs from the surface/ compartment definitions.

Then the stiffeners and longitudinals are defined and a check is made against the required sectional modulus. All longitudinal material is created along the entire length of the ship.

Typical transverse bulkhead arrangements, webs and floors are modelled.

TitleResults for “How to create a CRG?”Also Available in