Hull and Outfitting

Spreading Pipes about the Rack

  • Last UpdatedNov 18, 2025
  • 1 minute read

Keywords:

SPREAD

Description:

SPREAD moves the pipes laterally across the rack in the SDIR direction to give the specified clearance. The default clearance is 50mm between pipe walls on the same centerline.

Examples:

SPREAD /PIPES

Spreads the pipes in /PIPES about the designated rack

SP /PIPES WW 100

Spreads the pipes such that the wall-to-wall clearance is 100mm

SP /PIPES WF 4IN

Spreads the pipes such that the diameter of Flanges will be considered as part of the calculation. In this case, the distance between a Flange o/d and its adjacent pipe wall, will be a minimum of 4 inches.

SP /ZONE1 FF 75

Spreads the pipes such that two opposing Flange diameters will have a minimum clearance of 75mm. Pipes with no Flanges would have a wall-to-wall clearance of 75mm.

SP ALL

Repeat previously defined order sequence (for example, on a subsequent rack).

Command Syntax:

>-- SPread --+-- WW ---.
             |         |
             |-- FF ---|
             |         |
             |-- WF ---|
             |         |
             |-- ALL --|
             |         |
             ‘---------+-- <uval> --.   .-----<----.
                       |            |  /           |
                       ‘------------+-*-- <sgid> --+-->