Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Title Block Area

  • Last UpdatedDec 18, 2023
  • 1 minute read

250 ‘DATE’

The actual date is appended automatically in the required format (see DATE).

This Atext also uses Atexts 258 to 269, inclusive, if the date format is set to UK.

251 ‘PROJECT NO’

Used if the project number is to be plotted (see PROJECTNUMBER)

252 ‘BATCH REF’

The Marine zone name is appended automatically

253 ‘PIPING SPEC’

The value of the attribute SPEC from the element PIPE is appended automatically

254 ‘ISS’

The value of the attribute REV (that means, the revision level) from the element PIPE is appended automatically

255 ‘DRG’

Used only when a pipe is split over multiple drawing sheets. This Atext is used in conjunction with Atext 256 (in the format DRG 1 OF 2) or with Atext 276 (in the format CONT. FROM DRG 1).

256 ‘OF’

Used in conjunction with Atext 255

257 ‘SPL’

Denotes a SPOOL drawing. Sequential numbering, starting at 1 for each pipe, is appended automatically.

258 ‘JAN’

259 ‘FEB’

260 ‘MAR’

261 ‘APR’

262 ‘MAY’

263 ‘JUN’

264 ‘JUL’

265 ‘AUG’

266 ‘SEP’

267 ‘OCT’

268 ‘NOV

269 ‘DEC’

258 ‘JAN’ to 269 ‘DEC’ All used in conjunction with Atext 250 (for UK date formats)

270 ‘THERMAL INSULATION SPEC’

The value of the attribute ISPE of the element PIPE is appended automatically

271 ‘TRACING SPEC’

The value of the attribute TSPE of the element PIPE is appended automatically

272 ‘PAINTING SPEC’

The value of the attribute PTSP of the element PIPE is appended automatically

Related Links
TitleResults for “How to create a CRG?”Also Available in