Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Mechanical Drawings and Construction Drawings

  • Last UpdatedNov 28, 2025
  • 1 minute read

Each projection of the object that is constructed (for example, a pump or a house) can be handled as a subpicture on level 1. If any standard parts are added (for example, a nozzle or a window) to the object, then they probably should form level 2 subpictures. All new created information should then belong to a subpicture of its own on level 2. Subpictures on level 3 can be used freely during the creation of the drawing, when for example, duplicating information. By keeping the subpicture structure in good order, operations like "exchange all windows in the house" can be done easily by one command.

TitleResults for “How to create a CRG?”Also Available in