Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Floor Penetration ATTA Symbol

  • Last UpdatedJul 04, 2024
  • 1 minute read

Component Description

SKEY

Plotted Symbol

P-points

Note

Pipe passing through floor

FLOR

1,2,3

Notes:

  1. Same rules apply as those used for positioning the FLOW ARROW symbol (refer to In-line Components, Including Straight-through Valves in the Isodraft User Guide).

  2. Must only be positioned in vertical sections of pipeline.

  3. Isodraft will automatically orientate the fitting shape to suit the up/down direction of the pipeline.

Related Links
TitleResults for “How to create a CRG?”Also Available in