Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Loading/Discharging Sequence Dialog - General Page

  • Last UpdatedMay 26, 2023
  • 1 minute read

Loading/Discharging Sequence Dialog - General Page

Loading and/or discharging takes place between two loading conditions, which can be selected using the drop down lists. These loading conditions must be defined beforehand.

Other input on the page enables the output to be customized.

If the Check Visibility or Check Propeller Immersion boxes are checked, then these calculations will be carried out and the results reported for each loading/discharging stage.

If the Check Stability box is checked, then the stability at each stage will be checked using the selected critical stability results.

Similarly, if the Calculate Long. Strength box is checked, then the maximum shear force and bending moments, will be reported for each stage.

The Compartment names options and other longitudinal strength options, refer to the detailed output for each stage, and have the same effect as described for the Loading Condition dialog.

TitleResults for “How to create a CRG?”Also Available in