Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Changes to Upgrade Drawing Functionality​.

  • Last UpdatedMay 17, 2023
  • 2 minute read

Description

Previously after ‘Upgrade Drawing’ was executed either automatically on open or manually from the Tools menu it was not possible to cancel the operation. However, it was possible to close the drawing before the upgrade was completed and this caused an exception.

Now a progress bar is shown during ‘Upgrade Drawing’ and the operation can be safely cancelled:

Also, appropriate messages are added to the message log on operations start and cancel/finish:

Additionally, when ‘Upgrade Drawing’ is called manually from the Tools menu, a status window appears after the operation is completed:

or was stopped by the user:

In case the user opens a drawing that is not updated to the current product version and the ‘Upgrade drawing on Open’ option is set to false, the following warning appears in the message log:

If the ‘Upgrade drawing on Open’ is set to true, but for some reason the drawing cannot be opened automatically, an appropriate error message is added to the message log:

Benefits

The ‘Upgrade Drawing’ functionality works better and does not cause any errors.

Compatibility Constraints

None.

For More Information

Only noted here.

Affected Programs

Diagrams

In This Topic
Related Links
TitleResults for “How to create a CRG?”Also Available in