Concept Description_System Heir_Marine
- Last UpdatedJun 10, 2023
- 2 minute read
The Systems are used as vertical cost collectors for values of materials, work hours, subcontracted tasks and various expenses assigned to a project in AVEVA Enterprise Resource Management (AVEVA ERM). Systems are created in the s10002 Systems screen.

Systems are related to a system breakdown structure. The system breakdown structure can be created with multiple levels (hierarchy) or it can be created with no levels (flat structure). This can be done in the s10004 Set-Up Project Structure and Systems screen.
\
When using systems for a given project in AVEVA ERM (that is, when relating systems to material requirements in the s21000 Part List screen) only systems that are related to the project are valid.
It is possible to import project components with or without system information into AVEVA ERM. In case project components are imported without system, the system needs to be set manually for the project component. Then part lists with the project components can be imported into AVEVA ERM.
The following image shows the system setup in AVEVA Marine.
