Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Select

  • Last UpdatedNov 29, 2023
  • 1 minute read

Purpose:

To select which views will be active, that means, which will be updated during the modelling process.

Prerequisites:

A current drawing must exist.

Instruction:

The function can be switched between include mode and exclude mode with Options or Cancel, to make views active or inactive, respectively. Pick the desired views, or use All to select all views in the drawing. The function is terminated with Operation Complete or Quit. By default, all views are active.

Options:

None.

Result:

The set of active views will be updated.

Related Links
TitleResults for “How to create a CRG?”Also Available in