Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Create the First Subframework

  • Last UpdatedJan 12, 2026
  • 1 minute read

The sequence of operations will be slightly different, because the first subframework must be positioned and configured correctly, and the steel profiles applied and clearances checked before the second subframework is started. Following a similar sequence of operations to that given in Create Goalpost Support, carry out the following steps.

Exercise continues:

  1. Position the support plane for the North-South pipe run.

  2. Move the plane to a clearance of 250 mm in front of the Element ELBO 5 of PIPE/SAM-250-1/B1.

  3. Create the Framework.

  4. Create the Subframework.

  5. Create the template member in the usual way, with Hanger direction Up.

  6. Configure the support as an N-level goalpost with the stanchions pointing down.

  7. Change the length of the cross-member (dimension C on the Support Configuration form) to 2000, locking the start.

  8. Attach the anchor points to the floor.

TitleResults for “How to create a CRG?”Also Available in