Activating an Existing Panel
- Last UpdatedJan 31, 2023
- 1 minute read
When activating an existing panel, a number of different situations may occur:
-
The panel was not previously included in the view.
-
The panel is already in the view, but the model of it in the data bank is younger than the latest stored version of the drawing or the model is younger than the start-up time of the current session.
-
The model of the panel is older than the drawing.
In cases 1 and 2, a new version of the panel picture is automatically derived from the model to ensure a true correspondence with the model. This always requires some time.
In case 3 the existing panel picture is connected.