Update status of Equipment in AVEVA Engineering
- Last UpdatedJun 10, 2023
- 1 minute read
In AVEVA Engineering, a status called "Aveva Integration Maturity" is defined for all equipments. The status of an equipment is modified through the Status controller window to move the status to "Released for Procurement".