Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Move Rest Material

  • Last UpdatedJan 26, 2023
  • 1 minute read

Rest materials can be generated as part of the nesting process and are stored in the same place as the project material that is used for a nesting. Once a block is nested, some remaining rest materials can still be available. These rest materials can be moved into a project pool to allow usage when preparing production information for other blocks. Prior to activating the function, select the manufacturing package that is used for project material. When activating, a dialog with all manufacturing packages is presented and a selection of a package from which rest material shall be moved needs to be selected.

TitleResults for “How to create a CRG?”Also Available in