W
- Last UpdatedNov 28, 2025
- 2 minute read
|
Index |
Explanation |
|---|---|
|
WBS |
See work breakdown structure. |
|
work breakdown structure |
The work, needed to create a product, broken down into a hierarchy. Most often, the term is related to work as well as material, and thus the work breakdown structure (WBS) is the assembly hierarchy for physical assemblies and tasks developed to show how the work is split into different operations. Done correctly, each level is a particular type of task with related material and there may be a presumption that each level is performed in a defined location. (Levels may be skipped where for instance a simple bracket goes directly to a block.) |
|
work card |
A job card or form which contains relevant data for a work order. |
|
work operation |
One of the operations to perform as indicated in a work order. |
|
work order |
A collection of work operations (sometimes referred to as an operation list). This is usually issued to a foreman or a workshop team to perform a certain task. Work content is calculated per work order and back reporting of progress is done per work order. |
|
work package |
A work package is used to denote a part of a planning unit which is done at one workstation by one trade. Sometimes referred to as activity. Also see planning unit. A work package also denotes the complete set of information or documents needed to perform a certain job, for example, one work order and a set of drawings. |
|
work ticket |
See work card. |
|
worker category |
A group of workers having a specific skill or task, for example, welders, fitters. |
|
WP |
See work package. WP is alternatively used as an abbreviation for the product Weld Planning. |