Compartment Reports
- Last UpdatedDec 20, 2023
- 1 minute read
The required data to be included in the report is selected from the Report Options panel.
In general the data options are self explanatory, but of particular note are:
-
Topology - includes the topology information (boundaries for basic compartments, or merged definitions).
-
Drawing - if selected, the report format is altered. For each selected compartment, the information requested plus an isometric drawing (including axes drawn at the center of gravity) is presented individually. At the end of the report, the data information is summarized. The line drawing can be replaced with a shaded version by selecting the Shaded option.
The Compartment Report is generated for compartments as specified by the option All or Tree Selection (compartments need to be pre-selected in the Full View tab of Project Window (holds the Trees) before opening the dialog).
Click OK to produce the report, which is displayed in the first available report view or a new report view is opened.