To configure Material Definition:

  1. On the d0073 ERM System Settings dialog box, click Material Definition.

  2. Make the required changes in the General area.

  3. Click Apply and then click OK.

    Embedded Image (65% Scaling) (LIVE)

    Note: This page is used to set up all data related to the Material Definition module in AVEVA ERM.

The following table describes some of the fields:

UI Element

Description

Material Type Required

  • At the time of setting up AVEVA ERM, you must specify if the Material Type attribute must be mandatory or optional in the material definition catalogues in s20010 Project Components and s20011 Standard Materials.

  • Updatable.

  • Cleared by default.

System Unit for Fabricate and Drawing

  • Mentions the default unit of measure for fabricates and drawings

  • List of Values. Contains valid units defined in the s00010 screen.

  • Updatable.

  • Default value is "PCS"

Buyer Group Required

  • If the check box is selected, the buyer group is a required field when creating or updating standard materials (s20011), project components (s20010) and hull materials (s30017).

  • For AVEVA ERM-Design Integration to successfully transfer standard materials and project components from AVEVA Marine, the check box must be cleared before importing standard materials and project components into AVEVA ERM.

  • Updatable.

  • Cleared by default