Modify Basic Pipe Process Data
- Last UpdatedFeb 21, 2023
- 1 minute read
The basic pipe process data pane of the Modify Pipe window is used to modify the basic pipe data of a pipe element. From the Branch pane of the Modify Pipe window which is automatically displayed once the pipe is created, click Change Detail. The Modify Pipe is populated with the basic pipe data of the pipe element identified as the CE.

The functionality available from the Modify Pipe window, is identical to that available from the Create Pipe window. Refer to Create Pipe for further information.