Please ensure Javascript is enabled for purposes of website accessibility
Powered by Zoomin Software. For more details please contactZoomin

Hull and Outfitting

Point Sets

  • Last UpdatedJan 13, 2026
  • 1 minute read

These have been created with the minimum points required by MDS. These are:

P-Point

Description

1

Arrive Point

2

Leave Point

3

Bottom of Pipe (BOP) -5mm, that means, bottom of the ancillary geometry -5mm

9

BOP (Including geometry if required), that means, bottom of the ancillary geometry

10

Left of Pipe

11

Right of Pipe

12

BOP

The diagram below shows the position and directions of the p-points, P1 and P2 are arriving and leave points along the centerline of the pipe.

Note: The MDS default p-points provided cannot be deleted or modified, but additional p-points can be created if required.

TitleResults for “How to create a CRG?”Also Available in